So this morning after breakfast, we headed off to Shackerstone railway station. As you would expect, it has an old world feel to it, complete with a proper ticket office staffed by a station master, no such luxury with modern stations. We purchased our tickets, 2 adults and a dog, and in exchange for our money, we received the old style card tickets that could be clipped by the guard. The furry one was a little put out, as his ticket was for either a dog or a bicycle, and for carriage in the luggage wagon.
|
Ticket Office |
Once on the platform the carriages were already waiting, and at the far end, the engine, hissing and puffing away. First order of the day, was topping up the water tank.
|
Water tank filling |
The furry one, still not happy about his relegation to the status of luggage, so we relented, and allowed him to travel in first class with us. He had to settle for the floor, as the plush seating was out of bounds.
|
Oscar in first class |
Prior to our departure there was an opportunity to visit the footplate. The engineer and fireman were both busy making final preparations. As an interesting fact, the engine today would consume three quarters of a ton of coal, during its eight trips up and down the line. I also thought that the training to be an engineer would be fairly long, but was informed that the process can be completed in twelve months, with the right aptitude.
|
Footplate |
|
Hitched and ready to go |
The journey to Shenton takes about 35 minutes, with a stop at Market Bosworth on route. On arrival at Shenton we walked up to the site of the Bosworth battlefield information centre, and enjoyed a pleasant lunch in the warm sun. Returning to Shackerstone station, we visited the museum, where one of the staff shared their boiled egg lunch with Oscar.
|
Railway artefacts of a bygone age |
Tomorrow we head off for services at Market Bosworth Marina, and then onto Shenton for a couple of days. Needing to enter a Marina will almost certainly guarantee some windy conditions.
No comments:
Post a Comment