We departed Norton Junction at about 9.30 this morning heading towards the Watford lock flight. As we approached it became apparent there was a queue, and we were number three. There was also one more boat in the flight going up, and three more on their way down which we would need to wait for. Still, at least it was warm and sunny. About an hour later we were on our way up. The flight was manned by volunteers, who helped with our progression through the central staircase section. We had been close to the M1 for a while, but once through the top lock, we passed beneath the motorway and soon left the noise behind us. Although we'd had a bit of a wait, it is nothing like the wait people will have in a couple of weeks time, when all the Crick Boat Show traffic is on the move. It is one of the reasons we have returned to the summit level a tad early. Then it was Crick tunnel, wet as usual, but not as bad as it has been previously. Passing Crick Marina we were soon on familiar water, rounding Cracks Hill and Yelvertoft. We passed our winter home, noting our usual berth is currently empty, and then stopped for water by bridge 19. Whilst waiting we had a bite to eat, then it was on again, about half a mile to our intended mooring spot.
We don't have any hard and fast plans now until the Crick Boat Show, so will spend a few days here and there on the summit level, before returning to Yelvertoft Marina.
Totals 7 Miles 7 Locks 1 Tunnel
Running total 101 Miles 68 Locks 5 Tunnels
No comments:
Post a Comment