So now for some photos.
The work inside the boat is going into overdrive as well. With only 47 days till the Crick boat show there is not much time left. The tiling around the stove area is nearly complete and the recessed lighting has been installed. Work has also begun in the engine room to install all the technical stuff.
The silver box is the brains of the 240 volt travel power
Splash back to the galley worktop are glass mosaic tiles
All doors have been scumbled and will have traditional roses
painted on. The rear doors will also have the castles.
Finally Oscar who has grown substantially since his first appearance in this blog. We have told him if he gets too big he won't fit in his new home so he had better stop growing soon.